Goodson’s Total Bidding User Guide

Written so anyone can follow: from the plans to a finished bid folder in one sitting.

For Goodson’s Total Bidding · Open Goodson’s Total Bidding

What's a Bid?

A bid tells a customer how much it will cost to do their job. Think of it as the price ticket for a big project.

When someone wants to build a school, a hospital or a train station, they ask companies like ours for bids. The customer reads every bid and picks one.

Your job is to make the bid right. Goodson’s Total Bidding does the pricing, the labor, the bill of materials, the proposal and the job scope. You give it the counts and check its work.

How long does it take? Once the plans are counted, about 10 to 15 minutes: four answers on one screen, one click to build, a few minutes of checking. Counting the plans is the longest part.

Before You Start

Have these ready:

  1. The plans (drawings, as PDFs). You count them in the Takeoff tab, or bring a count sheet someone already made (Excel, CSV or PDF).
  2. The specs (the written rulebook, usually "Division 27" or "Division 28"). Optional, but the program reads it and fills in most of the project information for you: name, due date, client, location, prevailing wage, railroad work and the systems.
  3. Your sign-in: your work email and password.

Have a wage determination (Davis-Bacon or a state prevailing-wage decision)? Keep it handy. It goes in the same drop box as the take-off.

No plans yet, only a building size and type? Use Tools → System Design. It designs the systems from the building profile and sends them to the bid as a take-off.

Step 1 · Sign In

  1. Open Goodson’s Total Bidding in Chrome, Edge or Safari, at the company address (not a preview link: preview links show the pages but cannot sign you in).
  2. Type your work email and password.
  3. Click SIGN IN.
Forgot your password? Ask your administrator. They can reset it in about 30 seconds.

Step 2 · Count the Plans (Takeoff tab)

The bidder prices counts; it does not count drawings itself. The counting happens in the Takeoff tab:

  1. Open the Takeoff tab and drop in the plan PDFs.
  2. The program places the devices from the legend and measures the cable runs. Where a sheet has no scale, it uses an average run: 150 ft, or 250 ft in a warehouse.
  3. Review anything it flags, then export the take-off. You get an Excel workbook.
Already have a count sheet? Skip this step. Any reasonable column layout works (Item, Qty, Unit, Unit Cost, Mfg, Part #, Cable Length). Whatever quantity is in the file is what ships, so check it before you upload.

Step 3 · Start a New Bid

The top of the screen has four buttons:

ButtonWhat it does
NEW BIDStarts a blank bid.
SAVED BIDSOpens a bid you saved before.
WORKBENCHChecks the numbers, scope, risks and margin of the open bid.
TOOLS ▾Everything else (see Tools Menu).

Click NEW BID. If you were working on another bid, save it first when the program asks.

Step 4 · Quick Bid: Drop the Files, Answer Four Things

Project Setup opens as Quick Bid.

The program makes its own count. When the bid folder has drawings, the program counts them itself, prices every device with the company's own past prices (by part number, or by device type from the company price book), and sets its own labor hours. A take-off or estimate workbook already in the folder is kept for reference only and never priced. Items the owner or another trade furnishes (door hardware, "by owner", Division 26) are left out of the price and listed in the proposal. Pick only the systems we are bidding: a system that is not ticked is left out.

The fast way: the red FINISH BID button. Once the bid folder is loaded and the drawings are counted, press the red FINISH BID button (top of Quick Bid, and next to New Bid). It fills anything missing, builds the bid, runs Travel and Results, and opens the Bid Folder on 05 Proposal. It tells you what it filled in: a due date one week out at 2:00 PM, prevailing wage rates for the job's county (Sacramento if the county is not found), and any spec items nobody decided on, which go into the proposal as exclusions. Check those before you send the bid.

  1. Drop the files. Click Open Bid Folder and pick the whole project folder (or its .zip), or drop the spec book and the take-off workbook into their boxes. A wage determination goes in the take-off box.
  2. Answer four things. Most fill themselves from the spec and the take-off; you mainly check them:
    • Project name
    • Bid due date and time (required: it drives the deadline banner)
    • Project location (sets sales tax, travel and the price area)
    • Which systems are we bidding? The company's eight systems show first: CCTV, Access Control, Intrusion Detection, Structured Cabling, Fire Alarm, Audio Visual, DAS and Networking. Click More systems for the rest. Systems found in the take-off are checked for you (marked ✨); unchecking one keeps it off.
  3. Click Next.

The blue line at the top of the page shows what the program set for you: the wage basis, railroad work, travel and the pricing method. It reads prevailing wage and railroad work from the spec, sets travel from the location, uses your name as the estimator and prices with the company standard.

Need to change something? Open Advanced under the systems. It holds addenda, bid to (general contractor or owner), bid number, estimator, salesperson, project type, wage, work shift, railroad, prime contractor and the pricing and markups. Prefer the old single page? Click Show full setup.
Only check the systems we are bidding. A system that is on the plans but not in our bid is listed, not priced.

Step 5 · Review and Build

The Review & Build step shows a checklist of what the bid is built from. Fix anything it flags, then click BUILD THIS BID.

The program prices every line, turns cable runs into footage (rounded up to full 1,000 ft boxes), adds the company's labor hours and job tasks, and totals it all.

Step 6 · Travel & Costs

Travel and per diem turn on by themselves when the job is more than an hour's drive from Rancho Cordova. The crew stays Monday night through Friday morning and drives home every Friday. Change the crew size, or turn travel off for a local crew, then click Next.

Step 7 · Results & Questions

You get the bid total, the full bill of materials, the RFIs (questions for the GC) and the exclusions. Read the total: is it about right for a job this size?

Step 8 · Build the Bid Folder

Click BUILD BID FOLDER at the top of Results. The program builds every document for the bid and files it in numbered folders, like a project document library:

FolderWhat's in it
01 Bid SummaryBid price, material, labor, travel, hours, margin found, and a list of every file
02 Job ScopeThe scope of work from the bid, specs and plans: the work by system with quantities, labor hours for every task, hours each and a crew pace (for example "4 cameras per day"), a labor plan with crew-days, products specified, what is by others, exclusions, assumptions and open RFIs
03 EstimateThe full Excel workbook and the bid data
04 Bill of MaterialsThe BOM workbook and a print copy
05 ProposalFull and executive proposals (Word)
06 RFIs & ClarificationsRFI log, exclusions, potential change orders
07 Margin OpportunitiesWays to raise margin without a change order (see Margin Finder)
08 AnalysisThe analysis screens and report

Click a folder on the left to see its files. Open shows a file, Download saves one, and Download folder (.zip) saves everything with the same folders inside.

Give the job scope to the crew. The hours for each task let the foreman pace the job: if the scope says 8 hours per camera with a crew of two, the crew should finish about two cameras a day.

Step 9 · Check the Numbers (Workbench)

Click WORKBENCH. A window opens with tabs on the left:

Step 10 · Margin Finder

Open Workbench → Margin Finder and click Find margin. It lists ways to spend less delivering the same scope, so none of them need a change order:

Each idea is marked Measured (from this bid and the company's own prices), Estimate (a typical result: get a quote) or Check first (depends on something the program cannot see). Tick Do it on the ones the job will use; the found and committed totals save with the bid.

How Pricing Works

New bids use the company standard, the same way on every bid:

To change any of these on one bid, open Advanced → Pricing, rates and markups. Under Pricing method, change a percentage (leave a box blank for the company standard), or pick Custom markups to price the old way with your own markups.

Bids saved before the company standard reopen on custom markups, so their totals do not move.

Step 11 · Send the Bid

Make the Proposal

  1. On Results, click GENERATE PROPOSAL (or take it from 05 Proposal in the Bid Folder).
  2. Open the Word file. Check the cover page: the name and the price should be right.

Or Fill the Customer's Own Bid Form

Some GCs want their own form back. On Results, find the Customer Bid Form card and drag in their PDF. The program fills in your numbers (project information, base bid, alternates, license and DIR numbers, addenda) on their original pages. Check every value before you send it.

Send It

  1. Click Tools → Compliance → Send / DocuSign.
  2. Type the GC's email in To Email; the rest is filled in.
  3. Click Open in Email Client, attach the proposal and send.
  4. Come back and click Mark as Sent.

Save

The program saves every few minutes. Click SAVED BIDS to open any bid again.

You did it. 🎉

The Tools Menu

Everything that used to crowd the top of the screen is in Tools ▾. Nothing was removed:

Bonus · Ask the Bid Copilot

The round button in the bottom-right corner opens the Bid Copilot. Ask plain questions about the bid you have open:

It answers from this bid's own numbers. You can type, or use the microphone, and it can read answers out loud.

Public Bid? A Few Extra Steps

For public works (school district, city, state, federal), open Tools → Compliance:

DBE / SBE / MBE Suppliers

List your suppliers and their certifications. The page turns green when you meet the goal.

Insurance Certificate (COI)

Open COI Generator, fill in the GC's name and address, click Print Broker Request and send it to the insurance broker.

Bid Bond

Open Bid Bond; the amount is calculated. Click Print Bond Request and email it to the surety agent.

DAS-140 (California public works only)

After you win, you have 5 days to send the DAS-140 form to the apprenticeship committee. Open DAS-140 / 142, click Generate Cover Letter, and mail it with the DAS form from dir.ca.gov.

If You Get Stuck

"Sign-in is briefly unavailable"

Check the address. Preview links cannot sign in; use the company address. If it happens there, wait a minute and try again.

My take-off didn't read right (wrong names, missing lines, or a $0 total)

Almost always a column header. Make sure there is a clear Description column and a Qty column with a number on every row you want. A take-off with quantities and no prices still builds. Fix the headers and upload again.

My cable footage looks wrong

If the sheet has both a run count and a length, the program multiplies them. If your Qty column is already total footage, leave the run count blank. Cable always rounds up to full 1,000 ft boxes.

My wage determination didn't apply

Make sure the file clearly says "wage determination," "Davis-Bacon" or "prevailing wage." Upload it on its own if needed.

Railroad pricing turned on (or didn't)

The program turns railroad pricing on when the project name or the spec names railroad work (it needs two different railroad terms in the spec). Change it under Advanced → Railroad.

"API Rate Limit" at the top

The program is busy. Wait a few minutes and try again.

"Audio Visual: 0 devices" stops the export

Audio Visual is checked but the take-off has no AV lines. Uncheck it in Which systems are we bidding? and try again.

The total looks too high or too low

Open Workbench → Dashboard for the breakdown, then Discrepancies for lines that didn't read right. Check Advanced → Pricing, rates and markups to see whether the bid uses the company standard or custom markups.

I closed the tab

Click SAVED BIDS and pick the project. The program saves every few minutes.

Still stuck?

Ask your estimating lead about estimating, pricing and scope, and your administrator about sign-in and anything acting strange.

Words You'll Hear

WordWhat it means
BidThe total price you give the customer.
ProposalThe Word document that presents the bid.
Take-offThe count of every device and cable run on the plans. The bid is built from it.
Job scopeWhat we will do on the job, system by system, with the labor hours for each task.
Bid FolderEvery document for the bid, filed in numbered folders.
PlansThe drawings of the building.
SpecsThe written rulebook for the building.
Wage determinationA government document listing required pay rates on a public job.
AddendumAn update to the plans or specs sent after the original.
BOMBill of materials: every part needed.
GCGeneral contractor: the company building the whole project. We usually bid to them.
OwnerThe customer who pays for everything.
RFIRequest for information: a written question to the GC when something is unclear.
SubmittalThe product data we send for approval before installing.
MarkupThe amount added on top of cost. The company standard is 29%.
Add-onsMaterial support, shipping, warranty and pre-construction general conditions, added to every bid.
Crew paceHow many of an item the crew should finish per day to stay on the hours the bid carries.
MarginWhat the company keeps after paying for the job. The Margin Finder raises it without changing the price.
ContingencyMoney set aside for surprises. Off unless you add it.
Prevailing wageThe higher pay rate the government requires on public works.
NICNot in contract: not our work.
By othersAnother contractor does this part.
COChange order: the job changed after work started, with extra paperwork and money.
VEValue engineering: a cheaper alternate offered to the customer. It changes the scope, so the customer must agree.
FACPFire alarm control panel.
IDF / MDFThe rooms where network equipment lives. The MDF is the main one.

Last Thing

The first bid takes the longest. By the fifth, you'll feel like you've done this forever.

Everyone here was new once. Ask questions, check the numbers, and send bids you can stand behind.