A bid tells a customer how much it will cost to do their job. Think of it as the price ticket for a big project.
When someone wants to build a school, a hospital or a train station, they ask companies like ours for bids. The customer reads every bid and picks one.
Your job is to make the bid right. Goodson’s Total Bidding does the pricing, the labor, the bill of materials, the proposal and the job scope. You give it the counts and check its work.
Have these ready:
Have a wage determination (Davis-Bacon or a state prevailing-wage decision)? Keep it handy. It goes in the same drop box as the take-off.
No plans yet, only a building size and type? Use Tools → System Design. It designs the systems from the building profile and sends them to the bid as a take-off.
The bidder prices counts; it does not count drawings itself. The counting happens in the Takeoff tab:
The top of the screen has four buttons:
| Button | What it does |
|---|---|
| Starts a blank bid. | |
| Opens a bid you saved before. | |
| Checks the numbers, scope, risks and margin of the open bid. | |
| Everything else (see Tools Menu). |
Click NEW BID. If you were working on another bid, save it first when the program asks.
Project Setup opens as Quick Bid.
The program makes its own count. When the bid folder has drawings, the program counts them itself, prices every device with the company's own past prices (by part number, or by device type from the company price book), and sets its own labor hours. A take-off or estimate workbook already in the folder is kept for reference only and never priced. Items the owner or another trade furnishes (door hardware, "by owner", Division 26) are left out of the price and listed in the proposal. Pick only the systems we are bidding: a system that is not ticked is left out.
The fast way: the red FINISH BID button. Once the bid folder is loaded and the drawings are counted, press the red FINISH BID button (top of Quick Bid, and next to New Bid). It fills anything missing, builds the bid, runs Travel and Results, and opens the Bid Folder on 05 Proposal. It tells you what it filled in: a due date one week out at 2:00 PM, prevailing wage rates for the job's county (Sacramento if the county is not found), and any spec items nobody decided on, which go into the proposal as exclusions. Check those before you send the bid.
The blue line at the top of the page shows what the program set for you: the wage basis, railroad work, travel and the pricing method. It reads prevailing wage and railroad work from the spec, sets travel from the location, uses your name as the estimator and prices with the company standard.
The Review & Build step shows a checklist of what the bid is built from. Fix anything it flags, then click .
The program prices every line, turns cable runs into footage (rounded up to full 1,000 ft boxes), adds the company's labor hours and job tasks, and totals it all.
Travel and per diem turn on by themselves when the job is more than an hour's drive from Rancho Cordova. The crew stays Monday night through Friday morning and drives home every Friday. Change the crew size, or turn travel off for a local crew, then click Next.
You get the bid total, the full bill of materials, the RFIs (questions for the GC) and the exclusions. Read the total: is it about right for a job this size?
Click BUILD BID FOLDER at the top of Results. The program builds every document for the bid and files it in numbered folders, like a project document library:
| Folder | What's in it |
|---|---|
| 01 Bid Summary | Bid price, material, labor, travel, hours, margin found, and a list of every file |
| 02 Job Scope | The scope of work from the bid, specs and plans: the work by system with quantities, labor hours for every task, hours each and a crew pace (for example "4 cameras per day"), a labor plan with crew-days, products specified, what is by others, exclusions, assumptions and open RFIs |
| 03 Estimate | The full Excel workbook and the bid data |
| 04 Bill of Materials | The BOM workbook and a print copy |
| 05 Proposal | Full and executive proposals (Word) |
| 06 RFIs & Clarifications | RFI log, exclusions, potential change orders |
| 07 Margin Opportunities | Ways to raise margin without a change order (see Margin Finder) |
| 08 Analysis | The analysis screens and report |
Click a folder on the left to see its files. Open shows a file, Download saves one, and Download folder (.zip) saves everything with the same folders inside.
Click . A window opens with tabs on the left:
Open Workbench → Margin Finder and click Find margin. It lists ways to spend less delivering the same scope, so none of them need a change order:
Each idea is marked Measured (from this bid and the company's own prices), Estimate (a typical result: get a quote) or Check first (depends on something the program cannot see). Tick Do it on the ones the job will use; the found and committed totals save with the bid.
New bids use the company standard, the same way on every bid:
To change any of these on one bid, open Advanced → Pricing, rates and markups. Under Pricing method, change a percentage (leave a box blank for the company standard), or pick Custom markups to price the old way with your own markups.
Some GCs want their own form back. On Results, find the Customer Bid Form card and drag in their PDF. The program fills in your numbers (project information, base bid, alternates, license and DIR numbers, addenda) on their original pages. Check every value before you send it.
The program saves every few minutes. Click SAVED BIDS to open any bid again.
You did it. 🎉
Everything that used to crowd the top of the screen is in Tools ▾. Nothing was removed:
The round button in the bottom-right corner opens the Bid Copilot. Ask plain questions about the bid you have open:
It answers from this bid's own numbers. You can type, or use the microphone, and it can read answers out loud.
For public works (school district, city, state, federal), open Tools → Compliance:
List your suppliers and their certifications. The page turns green when you meet the goal.
Open COI Generator, fill in the GC's name and address, click Print Broker Request and send it to the insurance broker.
Open Bid Bond; the amount is calculated. Click Print Bond Request and email it to the surety agent.
After you win, you have 5 days to send the DAS-140 form to the apprenticeship committee. Open DAS-140 / 142, click Generate Cover Letter, and mail it with the DAS form from dir.ca.gov.
Check the address. Preview links cannot sign in; use the company address. If it happens there, wait a minute and try again.
Almost always a column header. Make sure there is a clear Description column and a Qty column with a number on every row you want. A take-off with quantities and no prices still builds. Fix the headers and upload again.
If the sheet has both a run count and a length, the program multiplies them. If your Qty column is already total footage, leave the run count blank. Cable always rounds up to full 1,000 ft boxes.
Make sure the file clearly says "wage determination," "Davis-Bacon" or "prevailing wage." Upload it on its own if needed.
The program turns railroad pricing on when the project name or the spec names railroad work (it needs two different railroad terms in the spec). Change it under Advanced → Railroad.
The program is busy. Wait a few minutes and try again.
Audio Visual is checked but the take-off has no AV lines. Uncheck it in Which systems are we bidding? and try again.
Open Workbench → Dashboard for the breakdown, then Discrepancies for lines that didn't read right. Check Advanced → Pricing, rates and markups to see whether the bid uses the company standard or custom markups.
Click SAVED BIDS and pick the project. The program saves every few minutes.
Ask your estimating lead about estimating, pricing and scope, and your administrator about sign-in and anything acting strange.
| Word | What it means |
|---|---|
| Bid | The total price you give the customer. |
| Proposal | The Word document that presents the bid. |
| Take-off | The count of every device and cable run on the plans. The bid is built from it. |
| Job scope | What we will do on the job, system by system, with the labor hours for each task. |
| Bid Folder | Every document for the bid, filed in numbered folders. |
| Plans | The drawings of the building. |
| Specs | The written rulebook for the building. |
| Wage determination | A government document listing required pay rates on a public job. |
| Addendum | An update to the plans or specs sent after the original. |
| BOM | Bill of materials: every part needed. |
| GC | General contractor: the company building the whole project. We usually bid to them. |
| Owner | The customer who pays for everything. |
| RFI | Request for information: a written question to the GC when something is unclear. |
| Submittal | The product data we send for approval before installing. |
| Markup | The amount added on top of cost. The company standard is 29%. |
| Add-ons | Material support, shipping, warranty and pre-construction general conditions, added to every bid. |
| Crew pace | How many of an item the crew should finish per day to stay on the hours the bid carries. |
| Margin | What the company keeps after paying for the job. The Margin Finder raises it without changing the price. |
| Contingency | Money set aside for surprises. Off unless you add it. |
| Prevailing wage | The higher pay rate the government requires on public works. |
| NIC | Not in contract: not our work. |
| By others | Another contractor does this part. |
| CO | Change order: the job changed after work started, with extra paperwork and money. |
| VE | Value engineering: a cheaper alternate offered to the customer. It changes the scope, so the customer must agree. |
| FACP | Fire alarm control panel. |
| IDF / MDF | The rooms where network equipment lives. The MDF is the main one. |
The first bid takes the longest. By the fifth, you'll feel like you've done this forever.
Everyone here was new once. Ask questions, check the numbers, and send bids you can stand behind.